Design & Engineering for Poverty Hollow Road Stabilization and Reconstruction
Redding, Town of, CTGeneral ConstructionOpen
Closing: August 27, 2026
Scope
On July 21, 2026 a localized washout of Poverty Hollow Road occurred during a heavy rainfall event, resulting in a section of the edge/underside of the roadway washing down a vertical slope. The washout Hill and Goodridge Roads. At the bridge, the Aspetuck River crosses beneath the road and drops into a gorge.
🔒 Full bid details are available to members
Sign in or create a free account to view the complete scope, contact information, documents, AI analysis, and the official source link.