Springfield Water and Sewer Commission, MASitework / PavingOpen
Closing: October 13, 2026
Scope
: The project includes the replacement of two existing culverts. Culvert 1 will replace a stone culvert with a 6-foot wide x 5-foot deep (72” x 60”) box culvert lined with a 2-foot deep stone infill. Culvert 2 will replace a 24” corrugated metal pipe with a 3-foot wide x 2-foot deep (36” x 24”) box culvert lined with no stone infill.
🔒 Full bid details are available to members
Sign in or create a free account to view the complete scope, contact information, documents, AI analysis, and the official source link.